Promises Delivered
We take pride in a track record where some of the most complex engineering challenges have been transformed into outstanding achievements. These projects demonstrate ODCC’s ability to deliver lasting value to the energy industry.
Explore our completed national and international projects across diverse sectors of the energy industry.
Filters:
Location:
Abadan-Khouzestan
Scope of Work
The project includes construction and commissioning of new units with a 210,000 barrels-per-day crude oil processing capacity, comprising:
I. Licensed Units:
II. Non-Licensed Units
Project Objectives
Sarvestan-Fars
Project Overview
Project Objective
Ahvaz-Khuzestan
The contractor performed complete engineering, procurement, construction, and installation activities, covering:
The station was equipped with 10-inch and 16-inch pumps installed on two corresponding 10-inch and 16-inch pipelines. These lines enable the transfer of petroleum products—gasoline, kerosene, and diesel—with daily capacities of 70,000 barrels and 120,000 barrels, respectively. The products are received from the Abadan inlet pipeline and pumped onward to downstream stations, ultimately reaching the Ray terminal.
Asaluyeh-Bushehr
Skope of Work
Construction, Pre-commissioning and Assistance to Commissioning of Area A of Phase 20 & 21 including the following units:
Tabriz-East Azerbaijan
Bandar Abbas-Hormozgan
Project Partners
Ilam-Ilam
I. Pure sulfur
II. Bentonite-enriched sulfur
Tehran-Tehran
Kangan-Bushehr
Principal Units Covered in the Engineering Package
Ardabil-Ardabil
Nurabad-Fars
Aghajari-Khuzestan
Arak-Markazi
Capacities After Completion
Project Highlights
Esfahan-Esfahan
Turkmenistan
Turkmenbashi-Turkmenistan
Gasoline Production Unit (GPU) downstream sections of MSCC unit were executed as EPC Project at Turkmenbashi Refinery.
GPU Consist of the Following Process Units: